← Assignment register
Assignment 24 / Roads & Highways

Adoor–Chengannur Road Project

SVJ contribution

Post-bid detailed engineering

The assignment

A defined scope.
A considered contribution.

Post-bid detailed engineering for a 23 km World Bank-funded EPC road project.

Our stated role

Post-bid detailed engineering

Discuss a similar requirement ↗