Assignment 24 / Roads & Highways
Adoor–Chengannur Road Project
SVJ contribution
Post-bid detailed engineering
The assignmentA defined scope.
A defined scope.
A considered contribution.
Post-bid detailed engineering for a 23 km World Bank-funded EPC road project.
Our stated role
Discuss a similar requirement ↗
Book consultation