Experience / SVJ Engineers & Consultants
Our role.
Project by project.
Infrastructure takes many hands.
Our contribution is engineering judgment, applied to a defined scope. Explore the assignments we have supported and the role we held in each.
Explore the register ↓Where we contribute.
The assignment register
The context. Our contribution.
Open an entry for the scope and engagement details.
Ref.Assignment / locationSVJ contribution
01BuildingsITC Guntur ComplexGuntur, Andhra PradeshSVJ contributionDesign consultant
Assignment contextITC Residential-cum-Commercial Complex
Design consultancy for construction of a residential-cum-commercial complex for ITC in Guntur.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- ITC Ltd
- Status in profile
- Completed
- Reported project value
- ₹102.2 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
02AirportCochin AirportCochin, KeralaSVJ contributionDesign and construction including project management
Assignment contextCochin Airport Apron, Taxi Links & Ground Lighting
Design and construction of apron and taxi links including ground lighting at Cochin International Airport.
View assignment note ↗ - SVJ’s stated role
- Design and construction including project management
- Client
- GHV Infra, Mumbai
- Status in profile
- Completed
- Reported project value
- ₹164.74 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
03AutomotiveRenault–Nissan Test TrackChennai, Tamil NaduSVJ contributionDesign consultant
Assignment contextRenault–Nissan High-Speed Automotive Test Track
Design of a high-speed automotive test track including drainage and allied structures.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Renault Nissan Automotive India Pvt Ltd
- Status in profile
- Completed
- Reported project value
- ₹56.92 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
04Roads & HighwaysMukola–TN BorderKerala / Tamil Nadu borderSVJ contributionPre-bid engineering services
Assignment contextMukola–Tamil Nadu Border National Highway Four-Laning
Pre-bid engineering for four-laning of the National Highway from Mukola to the Tamil Nadu border on EPC mode.
View assignment note ↗ - SVJ’s stated role
- Pre-bid engineering services
- Client
- EKK Infrastructure Pvt Ltd
- Status in profile
- Completed
- Reported project value
- ₹546 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
05Roads & HighwaysRICK Highway RehabilitationKeralaSVJ contributionDetailed engineering consultancy
Assignment contextKerala State Highway Rehabilitation for RICK
Detailed engineering for rehabilitation of state highways to two-lane specifications under Hybrid Annuity Mode.
View assignment note ↗ - SVJ’s stated role
- Detailed engineering consultancy
- Client
- EKK Infra–INKEL JV
- Status in profile
- Completed
- Reported project value
- ₹165 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
06Roads & HighwaysMadanapalli–PalamaneruAndhra PradeshSVJ contributionPre-bid engineering services
Assignment contextMadanapalli–Palamaneru National Highway Improvement
Pre-bid engineering for improvement to two-lane paved-shoulder specifications on EPC mode.
View assignment note ↗ - SVJ’s stated role
- Pre-bid engineering services
- Client
- EKK Infrastructure Pvt Ltd
- Status in profile
- Completed
- Reported project value
- ₹498 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
07Roads & HighwaysMahe–Thalassery BypassKeralaSVJ contributionPre-bid engineering services
Assignment contextMahe–Thalassery Bypass NH 17
Pre-bid engineering for construction of the four-lane Mahe–Thalassery bypass on EPC mode.
View assignment note ↗ - SVJ’s stated role
- Pre-bid engineering services
- Client
- EKK–GHV
- Status in profile
- Completed
- Reported project value
- ₹881 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
08IndustrialGoa ShipyardGoaSVJ contributionDesign consultant
Assignment contextGoa Shipyard Infrastructure
Design consultancy for Goa Shipyard ancillary buildings and road infrastructure.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Architect CR Narayanarao, Chennai
- Status in profile
- Completed
- Reported project value
- ₹205 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
09Roads & HighwaysBodimettu–MunnarKeralaSVJ contributionDetailed engineering consultant
Assignment contextNH 85 Bodimettu–Munnar
Improvement of NH 85 from Bodimettu to Munnar to two-lane paved-shoulder specifications.
View assignment note ↗ - SVJ’s stated role
- Detailed engineering consultant
- Client
- DR Aggarwal–Greenworth
- Status in profile
- Completed
- Reported project value
- ₹301 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
10BuildingsITC WarehouseChennai / Arakonam, Tamil NaduSVJ contributionDesign consultant
Assignment contextITC Warehouse, Chennai–Arakonam
Design consultancy for construction of an ITC warehouse in the Chennai–Arakonam region.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Architect CR Narayanarao, Chennai
- Status in profile
- Completed
- Reported project value
- ₹96 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
11BridgesKarnataka RUB & ROBKarnatakaSVJ contributionPre-bid engineering services
Assignment contextRail Under Bridge and Road Over Bridge Package
Pre-bid engineering for rail-under-bridge and road-over-bridge works on EPC mode.
View assignment note ↗ - SVJ’s stated role
- Pre-bid engineering services
- Client
- Akshaya Builders, Kerala
- Status in profile
- Completed
- Reported project value
- ₹345 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
12Urban InfrastructureKollegal City RoadsKollegal, KarnatakaSVJ contributionProject management consultancy
Assignment contextKollegal City Roads Upgrade
Project management consultancy for construction and upgrading of city roads in Kollegal.
View assignment note ↗ - SVJ’s stated role
- Project management consultancy
- Client
- Theruvath Builders
- Status in profile
- Completed
- Reported project value
- ₹56.25 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
13Water & UtilitiesAl Abra UtilitiesAl Abra, KuwaitSVJ contributionPre-bid engineering services
Assignment contextAl Abra Sewage Line
Pre-bid engineering for design and construction of a sewage line in Al Abra.
View assignment note ↗ - SVJ’s stated role
- Pre-bid engineering services
- Client
- Anchor Ceramics
- Status in profile
- Completed
- Reported project value
- ₹398.25 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
14Roads & HighwaysThalapady–ChengalaKeralaSVJ contributionPre-bid engineering services
Assignment contextThalapady–Chengala Four-Laning
Pre-bid engineering for four-laning under Hybrid Annuity Mode.
View assignment note ↗ - SVJ’s stated role
- Pre-bid engineering services
- Client
- Adani Infra
- Status in profile
- Completed
- Reported project value
- ₹1,076 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
15Roads & HighwaysOddanchathram BypassTamil NaduSVJ contributionAssociate design consultant
Assignment contextOddanchathram Bypass Four-Laning
Associate design consultancy for four-laning of the Oddanchathram bypass under Hybrid Annuity Mode.
View assignment note ↗ - SVJ’s stated role
- Associate design consultant
- Client
- ALR
- Status in profile
- Completed
- Reported project value
- ₹221 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
16IndustrialITC AmbernathAmbernath, MaharashtraSVJ contributionProof checking
Assignment contextITC Ambernath Internal Roads & Drainage
Proof checking of internal road and drainage designs for an ITC warehouse factory building.
View assignment note ↗ - SVJ’s stated role
- Proof checking
- Client
- ITC Ltd
- Status in profile
- Completed
- Reported project value
- ₹132 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
17Urban InfrastructureKilambakkam TerminusKilambakkam, Tamil NaduSVJ contributionDesign consultant
Assignment contextKilambakkam Mofussil Bus Terminus
Design consultancy for construction of the Mofussil Bus Terminus at Kilambakkam.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Architect CR Narayanarao, Chennai
- Status in profile
- Completed
- Reported project value
- ₹205.26 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
18AutomotiveHero MotoCorp Test TrackJaipur, RajasthanSVJ contributionDesign consultant
Assignment contextHero MotoCorp Automotive Test Track
Design consultancy for the proposed Hero MotorCorp test track in Jaipur.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Architect CR Narayanarao, Chennai
- Status in profile
- Completed
- Reported project value
- ₹75.6 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
19Roads & HighwaysDindigul–Theni–KumilyTamil NaduSVJ contributionPre-bid design consultancy
Assignment contextDindigul–Theni–Kumily Highway Project
Pre-bid design consultancy for the Dindigul–Theni–Kumily highway project.
View assignment note ↗ - SVJ’s stated role
- Pre-bid design consultancy
- Client
- TTK–ALR Consortium
- Status in profile
- Completed
- Reported project value
- ₹289 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
20Port & LogisticsContainer Terminal BudgetingVallarpadam / Chennai / MumbaiSVJ contributionPre-budgeting design
Assignment contextContainer Terminal & Internal Roads Budgeting
Pre-budgeting design for container terminals and internal roads at multiple locations.
View assignment note ↗ - SVJ’s stated role
- Pre-budgeting design
- Client
- Architect CR Narayanarao, Chennai
- Status in profile
- Completed
- Reported project value
- ₹0.25 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
21Roads & HighwaysDindigul–Theni–Kumuli NHAITamil NaduSVJ contributionDetailed engineering
Assignment contextDindigul–Theni–Kumuli NHAI Corridor
Detailed engineering for the 130 km Dindigul–Theni–Kumuli NHAI corridor.
View assignment note ↗ - SVJ’s stated role
- Detailed engineering
- Client
- TTK Infra Company
- Status in profile
- Completed
- Reported project value
- ₹289 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
22AutomotiveToyota Kirloskar Test TrackBangalore, KarnatakaSVJ contributionDesign consultant
Assignment contextToyota Kirloskar Automotive Test Track
Design consultancy for a proposed automotive test track for Toyota Kirloskar.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Architect CR Narayanarao, Chennai
- Status in profile
- Completed
- Reported project value
- ₹46.2 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
23BridgesMelnalathur BridgeTiruvallur, Tamil NaduSVJ contributionDesign consultant
Assignment contextMelnalathur Tank Major Bridge
Design consultancy for a 63.4 m major bridge across Melnalathur Tank for PCA Motors.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Tamil Nadu PWD
- Status in profile
- Completed
- Reported project value
- ₹13.25 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
24Roads & HighwaysAdoor–ChengannurKeralaSVJ contributionPost-bid detailed engineering
Assignment contextAdoor–Chengannur Road Project
Post-bid detailed engineering for a 23 km World Bank-funded EPC road project.
View assignment note ↗ - SVJ’s stated role
- Post-bid detailed engineering
- Client
- EKK Infrastructure
- Status in profile
- Completed
- Reported project value
- ₹102 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
25Port & LogisticsDubai Port PavementChennai / Vallarpadam, KochiSVJ contributionPost-design pavement consultant
Assignment contextDubai Port Container Yard Pavement
Pavement design for container yard and container freight station facilities associated with Dubai Port.
View assignment note ↗ - SVJ’s stated role
- Post-design pavement consultant
- Client
- Ocean Lifespaces
- Status in profile
- Completed
- Reported project value
- ₹244 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
26Roads & HighwaysThenmala–PunalurKeralaSVJ contributionDetailed engineering
Assignment contextThenmala–Punalur NH 744
Detailed engineering for NH 744 between Thenmala and Punalur on EPC mode.
View assignment note ↗ - SVJ’s stated role
- Detailed engineering
- Client
- Theruvath Builders
- Status in profile
- Completed
- Reported project value
- ₹45 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
27IndustrialHosur InfrastructureHosur, Tamil NaduSVJ contributionDetailed engineering design consultant
Assignment contextTata Projects Hosur Infrastructure
Detailed engineering for roads, drains, rainwater-harvesting ponds and associated infrastructure.
View assignment note ↗ - SVJ’s stated role
- Detailed engineering design consultant
- Client
- Architect CR Narayanarao, Chennai
- Status in profile
- Completed
- Reported project value
- ₹392 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
28Roads & HighwaysAshokakavala–PainavuKeralaSVJ contributionDesign consultant
Assignment contextAshokakavala–Painavu Road
Design consultancy for a World Bank-funded road construction project.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- EKK Infrastructure
- Status in profile
- Completed
- Reported project value
- ₹120 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
29Roads & HighwaysKumbakonam–SeergazhiTamil NaduSVJ contributionDesign consultant
Assignment contextKumbakonam–Seergazhi CKIC Corridor
Design consultancy for a 36 km ADB-funded Chennai–Kanyakumari Industrial Corridor upgrade to two-lane paved-shoulder standard.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- EKK Infrastructure
- Status in profile
- Ongoing
- Reported project value
- ₹265 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
30Roads & HighwaysMelur–ThirupatturTamil NaduSVJ contributionProof consultant
Assignment contextMelur–Thirupattur Industrial Corridor
Proof consultancy for a 23 km ADB-funded two-lane paved-shoulder corridor upgrade.
View assignment note ↗ - SVJ’s stated role
- Proof consultant
- Client
- SPL–Sai Hridham
- Status in profile
- Completed
- Reported project value
- ₹202 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
31Roads & HighwaysKumbakonam–MannargudiTamil NaduSVJ contributionDesign consultant
Assignment contextKumbakonam–Mannargudi CKIC Corridor
Design consultancy for a 16 km ADB-funded Chennai–Kanyakumari Industrial Corridor upgrade.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- TTK Infra Company
- Status in profile
- Completed
- Reported project value
- ₹96 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
32Roads & HighwaysNH 181 WideningTamil NaduSVJ contributionDesign consultancy
Assignment contextOld NH 67 / New NH 181 Widening
Design consultancy for widening and improvement from two lanes to four lanes on EPC basis.
View assignment note ↗ - SVJ’s stated role
- Design consultancy
- Client
- ARN Infra Pvt Ltd
- Status in profile
- Completed
- Reported project value
- ₹54.26 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
33Roads & HighwaysMusiri–NamakkalTamil NaduSVJ contributionDetailed engineering
Assignment contextNH 381B Musiri–Namakkal
Detailed engineering for a two-lane paved-shoulder NH 381B package on EPC mode.
View assignment note ↗ - SVJ’s stated role
- Detailed engineering
- Client
- EKK–ARN
- Status in profile
- Completed
- Reported project value
- ₹165 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
34AutomotiveMMST Karting TrackIrungattukottai, Tamil NaduSVJ contributionDesign consultant
Assignment contextMadras Motor Sports Trust Karting Track
Design consultancy for construction of a karting race track in Irungattukottai.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- Madras Motor Sports Trust
- Status in profile
- Completed
- Reported project value
- ₹26 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
35Port & LogisticsDubai Port Container YardChennai, Tamil NaduSVJ contributionPavement design consultant
Assignment contextDubai Port Chennai Container Yard
Pavement design for a container yard and container freight station associated with Dubai Port.
View assignment note ↗ - SVJ’s stated role
- Pavement design consultant
- Client
- Ocean Lifespaces
- Status in profile
- Completed
- Reported project value
- ₹230 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
36BridgesKutheripattu VUPTamil NaduSVJ contributionProof checking
Assignment contextKutheripattu NH 45 Black-Spot VUP
Proof checking for permanent black-spot rectification through a vehicular underpass at km 133+650 on NH 45.
View assignment note ↗ - SVJ’s stated role
- Proof checking
- Client
- TTK Infra Company
- Status in profile
- Completed
- Reported project value
- ₹49 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
37BridgesAriyalur VUPAriyalur, Tamil NaduSVJ contributionDesign consultancy
Assignment contextAriyalur Bypass NH 132 VUP
Design consultancy for a vehicular underpass at km 6/600 on the Ariyalur bypass under EPC mode.
View assignment note ↗ - SVJ’s stated role
- Design consultancy
- Client
- ARN Contractors
- Status in profile
- Completed
- Reported project value
- ₹42 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
38BridgesTVS Motor FOBHosur, Tamil NaduSVJ contributionDesign consultant
Assignment contextTVS Motor Hosur Foot Over Bridge
Design consultancy for a 68.6 m foot over bridge across SH 84 for TVS Motor Company.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- TTK Infra Company
- Status in profile
- Completed
- Reported project value
- ₹49 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
39BridgesNH 45 Foot Over BridgesTamil NaduSVJ contributionProof consultant
Assignment contextNH 45 Tambaram–Singaperumal Koil Foot Over Bridges
Proof consultancy for foot over bridges across NH 45 between Tambaram and Singaperumal Koil on EPC mode.
View assignment note ↗ - SVJ’s stated role
- Proof consultant
- Client
- Indra Enterprises
- Status in profile
- Ongoing
- Reported project value
- ₹16.56 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.
40Port & LogisticsPithampur MMLPPithampur, IndoreSVJ contributionDesign consultant
Assignment contextPithampur Multi Modal Logistics Park
Design consultancy for GR Infra for the Pithampur Multi Modal Logistics Park.
View assignment note ↗ - SVJ’s stated role
- Design consultant
- Client
- GR Infra / PROCONVIS
- Status in profile
- Ongoing
- Reported project value
- ₹480 crore
The value refers to the wider project, not SVJ’s consultancy fee. Status is as recorded in the company profile.