← Assignment register
Assignment 11 / Bridges

Rail Under Bridge and Road Over Bridge Package

SVJ contribution

Pre-bid engineering services

The assignment

A defined scope.
A considered contribution.

Pre-bid engineering for rail-under-bridge and road-over-bridge works on EPC mode.

Our stated role

Pre-bid engineering services

Discuss a similar requirement ↗